Things are proceeding very well at the new cabin. We have pretty much finished installing the insulation in the loft, just a couple of side walls to go, and it should be ready for drywall.
We have hopefully secured what I need to run electrical wiring from the old cabin to the new electrical box in the new cabin. I just hope the plumber has done his "digging" and has the new cabin connected to the sewer and new underground water supply installed so I can dig a trench (by hand, actually by spade) to run the new wiring.
Then we should have electricity, then on to the finish plumbing, wiring the new exhaust fan/heater in the bathroom, and all kinds of odds and ends. There are so many things we have to think of as we go cause we've never done this before. Anyway, its still fun. I am looking forward to July as I and hopefully herself will have a week off to work.
Boi
3 comments:
Bout time we get an update from you! Be nice to mom. :)
I will have a week vacation but half of that will have grandchildren so I'm thinking I probably won't be too much help. But! it will still be fun!
Himself does all the thinking. I just do the dreaming and the planning and the "wanting". I do the "go fer" trips to town! lol