Things are going very fast, now, it seems. The porch sealed and painted, a railing on the porch, a tree house has been built(first floor), the pine is up on the walls, and a new floor in the living room. A very busy season. Now, we have started on the loft, but in order to do that, all the tools we had been using for the downstairs, had to be moved out. So I spent almost an entire day clearing out the loft. Then taped the drywall, mudded the same, and sanded. All my favorite jobs. Then it was time to apply the textured paint. I decided it was time to get herself involved in painting, so we got her an ergonomically designed paint roller handle, loaded her up with paint, and off she went. Applying textured paint is not the easiest thing to do, as you have to go slow. But, off she went, and did a fine job. We did run out of paint, so hopefully boy/son will be able to get us some more.
Labor Day is coming up and hopefully we can finish the paint and then it will be time for some good food, and company.